Focus on heavy equipment

Located in the Caofeidian District of Tangshan, this project involves the drying of iron ore sludge. It is designed to process up to 93 tons of raw material per hour, with an initial moisture content of 24% or less. The complete drying production line continuously processes the iron ore sludge, reducing the final moisture content to 12% or less. Once operational, the project will enable the resource utilization of iron ore sludge (a solid waste), enhance material quality, and meet the requirements for subsequent production processes.

Leave A Message

Related Case

Hot Products Wechat/WhatsApp:+86 156-1759-1790

栏目ID=product的表不存在(操作类型=0)

Leave Us A Message

Custom design production solutions? Get a quote? Get product details? Leave us a message and we'll get back to you within 24 hours.