Focus on heavy equipment
With the acceleration of urbanization, the number and scale of wastewater treatment plants continue to expand, and the amount of sludge generated also increases sharply. The traditional sludge landfill disposal method is becoming increasingly limited, with saturated landfill capacity and high landfill disposal costs, such as up to $87/ton in some parts of the United States. In addition, sludge contains organic matter and nutrients, which can be treated for resource utilization. In order to better dispose of and utilize sludge from wastewater treatment plants, the current mainstream treatment method is to reduce the moisture content of sludge through drying, which can significantly reduce the transportation and disposal costs of sludge and provide convenient conditions for subsequent energy and resource utilization. So, what are the costs associated with installing a sludge drying system at a wastewater facility?
This part mainly involves the preparation work before project operation, including equipment procurement, transportation, civil engineering, and installation and commissioning costs.
There are two ways to reduce the moisture content of sludge - mechanical dewatering and thermal drying. Mechanical dewatering uses a sludge filter press, which is relatively simple and inexpensive, but can only reduce the moisture content of sludge to 65-75%, and transportation costs are still high. If further reduction of sludge moisture content is required, sludge thermal drying system is needed, commonly used is sludge rotary dryer, which adopts high-temperature drying process and can reduce sludge moisture to 10-20% at once, meeting the conditions of transportation and resource recovery. Although the initial investment of the sludge dryer is large, the long-term returns are significant.
The transportation cost mainly depends on equipment weight and transportation distance, the greater the weight of the equipment and the longer the transportation distance, the higher the cost.
Civil engineering mainly includes the construction and renovation of factory buildings, safety renovation of explosion-proof areas, and overall upgrading of electrical systems. This part usually accounts for 20% -25% of the total project investment, which can ensure the safe and stable operation of production lines and is also an essential investment.
The installation and debugging costs usually cover on-site equipment assembly, complex pipeline connections, automation control system integration, and whole line testing and operation to ensure that the equipment meets the design performance.
After the operation of the production line, expenses will also be incurred, mainly including energy and consumables consumption, maintenance costs, and labor costs.
According to the different heat sources chosen by customers (biomass, natural gas, coal, oil, etc.), this part of the cost will vary. Based on the lifecycle of the equipment, it accounts for approximately 40% of the total cost Customers can choose local economic heat sources, and we will customize a drying system based on the chosen heat source to minimize energy costs as much as possible.
Used for sewage treatment, the main cost is the use of chemical flocculants to condense solid substances in sewage.
Some mechanical vulnerable parts in the sludge drying production line, such as seals, bearings, and scrapers, are prone to wear and tear during long-term operation and need to be replaced regularly. The depreciation period of equipment is usually 10-15 years, which needs to be amortized and included in the cost.
The above are the cost items that need to be considered when installing a sludge drying system in a water treatment plant. Feasibility analysis needs to be done before starting the project. Zhengzhou Jiutian provides one-stop sewage sludge drying solutions. Please feel free to contact us at any time to obtain customized sludge solutions.
With the acceleration of urbanization, the number and scale of wastewater treatment plants continue to expand, and the amount of sludge generated also increases sharply. The traditional sludge landfill disposal method is becoming increasingly limited, wit
Petcoke is a by-product produced after crude oil distillation and extraction, mainly composed of carbon. It has high calorific value and high carbon content, and can be used as fuel, as well as in the production of electrodes, aluminum anodes, carbon mate
Limestone dryer is used to reduce the moisture content of limestone, which plays an important role in subsequent processing and ensuring product quality. The cost of installing a limestone dryer includes not only the purchase price of the equipment, but a
In industrial production, rotary dryer and flash dryer are two common gypsum drying equipment. The newly mined gypsum has a high moisture content, which can affect its compressive strength and easily crack during processing, affecting the quality of the f